Where we usually start
In the first call we walk through your current network, identity, endpoint, productivity, backup and security. From there we pick what has to be fixed first and what can move in parallel with an AI or business-system project.
For a Singapore SME, an IT integration engagement is more than a technical upgrade. Internal approvals, audit records, delivery documentation, Day-2 operations — all of that gets built into the plan from day one, not bolted on at go-live.
What’s in scope
Network & cybersecurity
SD-WAN, site-to-site VPN, guest Wi-Fi isolation, segmented VLANs for production OT vs. office IT. Firewall + EDR + 24×7 monitoring.
Identity & access
Microsoft Entra ID / Google Workspace as the single source of truth, SSO into every business app, conditional access (block legacy auth, enforce MFA, geo-fence sensitive resources).
Endpoint
Managed Windows / macOS / iOS / Android, full-disk encryption, EDR, automated patching, asset tracking. Intune / Jamf as unified MDM with verifiable device compliance state.
Productivity & collaboration
Microsoft 365 / Google Workspace rollout, including data migration, training, shadow-IT discovery. Lark / DingTalk / Kingsoft WPS for China-bridged operations.
Backup & business continuity
Integrated with TWO TWO BaaS or the Jumborca resilience platform — immutable snapshots and recovery drills for mail, endpoints, file servers and line-of-business databases. Backup strategy and DR plans go into the project deliverables from day one.
Support
24×7 bilingual helpdesk via ticket, email, phone, WhatsApp, WeChat. Quarterly service reviews with you.
Business systems on a dedicated page
ERP / CRM / OA solution advisory, product resale, professional delivery and custom development involve distinct product capabilities and a separate partner ecosystem. TWO TWO maintains a strategic alliance with Yonyou Singapore, covering YonSuite / YonBIP / YonGPT from selection through managed operations.
If your engagement centres on business systems, see TWO TWO × Yonyou Alliance. If both the IT foundation and business systems need to run under one local counterparty, we can bundle them into a single SOW.
If you plan to apply for PSG or EDG
The delivery artefacts your project generates — scope statements, change records, milestone evidence, sign-offs — are already filed to audit-grade standards. If you choose to apply for PSG or EDG, those artefacts go straight into the application as evidence. If you don’t apply, they still form a verifiable project record on their own.
For PSG specifically: IMDA’s pre-approved solutions list (CRM / financial / inventory / HR / cybersecurity) is familiar territory. In scoping we’ll flag which line items may fall into a PSG category and shape the SOW so the qualifying portion is documented cleanly and can carry the audit.
What we benchmark against
Engineering targets we anchor to, as a judgement baseline. Numbers reflect the range across delivered clients — your actual result depends on starting point and scope.
- MFA everywhere in 11 days, no legacy protocols left behind — achievable baseline for a 50–200 person SME
- ≤ 1 unplanned downtime incident in the first 12 months managed — the observed range for clients with change management + 24×7 NOC
- Grant submission passes on the first cycle — documented to audit-grade standards, no rework
- Full asset inventory + network topology + patch audit within 4 weeks of takeover — you don’t wait a quarter to know your own state
Contact sales — 30-minute discovery call to scope your current stack and identify the highest-ROI starting point.